January 21, 2026

Bognor Regis War Memorial Hospital boiler plant installation complete

New replacement central gas fired boiler plant installation complete at Bognor Regis War Memorial Hospital. All works carried out with minimal disruption to hospital operations. The system has been designed for future air source heat pump integration, so that heat can be provided to the hospital by a hybrid heat pump/ boiler plant system.

We look forward to collecting performance data via BMS later in the year, so that we can participate with seasonal commissioning.