Chailey Clinical Services decarbonised heating project is now complete. The works involved replacing existing gas fired boilers with new Air Souce Heat Pumps (ASHPs) to provide heating for the Chailey Clinical Services building.
The ASHPs are arranged in a duty/ stand-by configuration which provides resilience as required by the HTMs.
The works also involved an upgrade of the existing incoming power supply and reconfiguration of the existing site electrical infrastructure to provide sufficient power for the new ASHPs.
The Trust employed AMA to take over from another Consultant and we were retained for full MEP and Contract Administration duties.
AMA undertook a due diligence review of the existing design, redesign works, regular site inspections, cost control and witnessing the systems operation.